• Building Energy Infrastructure for a Stronger Future.

  • From Blueprint to Completion, We Deliver Excellence.

Garadagh Solar Power Plant

On January 9, 2020, the Ministry of Energy of the Republic of Azerbaijan and Azerbaijan Company of the United Arab Emirates signed an Implementation Agreement. According to the Agreement, pilot project will be implemented for the construction of solar power plant with a capacity of 230 MW by “Masdar”. In this regard, on April 6, 2021, Investment agreement, Power Purchase agreement and Transmission Connection agreement were signed on 230 MW solar power plant between the Ministry of Energy, Azerenergy OJSC and and “Masdar” of the United Arab Emirates.

The Garadagh Solar PV Plant is the largest solar power plant in the Caspian region and the CIS. The plant was built at the expense of foreign investment worth $262 million. It is the first industrial-scale solar power plant realized by attracting foreign investment in our country. The plant will produce 500 million kilowatt-hours of electricity annually, saving 110 million cubic meters of natural gas. At the same time, carbon emissions into the atmosphere will be reduced by 200 thousand tons. The power plant, which covers an area of 550 hectares, has 570 thousand solar panels installed. A 330-kilovolt substation was built to connect this station to the network.